FORMATION OF THE DIGITAL BUSINESS MODEL OF A CONSTRUCTION ENTERPRISE THROUGH THE IMPLEMENTATION OF DIGITAL TOOLS
DOI:
https://doi.org/10.32782/2413-9971/2026-62-7Keywords:
DBMCE, digital transformation, business model, construction enterprise, BIM, KPI, CDE, AHP, digital maturityAbstract
The relevance of the study stems from the need for construction enterprises to move from the fragmented adoption of individual digital tools towards the systematic transformation of their business models. Digitalisation is viewed as an organisational and economic mechanism affecting the value proposition, key processes, resources, financial logic, stakeholder interactions, and data use throughout the project life cycle. The article aims to formalise and test the DBMCE model as an integrated framework for implementing digital technologies within the business model of a construction enterprise. The methodology combines structural and functional modelling, min–max normalisation, the AHP, correlation and regression analysis with HC3 heteroskedasticity-robust standard errors, principal component analysis, k-means clustering, sensitivity analysis using Spearman’s rank correlation, and before-and-after scenario calculations. The DBMCE architecture comprises the V–P–R–F–S system, supplemented by a digital layer D integrating BIM, KPI/EVM, CDE, ERP, and smart contracts. BIM exhibited the strongest association with the composite KPI, while the BIM×KPI interaction was positive and statistically significant. The dynamic specification suggests a cumulative rather than immediate effect, supporting the rationale for phased implementation. The validation procedure indicated strong model adequacy and stability of both the three-cluster managerial segmentation and enterprise rankings under alternative weighting schemes. The before-and-after scenario yielded a 16.33% increase in the composite KPI, with the process component making the largest contribution. Since the P01–P24 dataset is synthetic, these findings validate only the computational framework and cannot be interpreted as evidence of external validity. The practical value lies in a phased implementation roadmap that combines BIM adoption, KPI-based management, a common data environment, contract and payment automation, and the development of employees’ digital competencies, linking these elements to measurable management outcomes. Further research should replicate the full procedure using a verified sample of construction enterprises and incorporate the remaining adjustment factors.
References
Загорецька О. Я., Дац А. Організаційно-економічний механізм цифрової трансформації будівельних підприємств на основі інтеграції BIM-технологій та освітнього потенціалу. Успіхи і досягнення у науці. 2026. № 2(24). С. 1528–1537. DOI: https://doi.org/10.52058/3041-1254-2026-2(24)-1528-1537
Загорецька О. Я., Дац А. Формування конкурентоспроможної моделі діяльності будівельного підприємства у відновленні культових споруд шляхом впровадження BIM, контролю змін та KPI як інвестиційного інструментарію. Наукові перспективи. 2026. № 2(68). С. 2316–2328. DOI: https://doi.org/10.52058/2708-7530-2026-2(68)-2316-2328
Sorokina L., Tsyfra T., Vahovich I. Modeling the Level of Implementation of BIM by Enterprises as a Means of Optimizing the Cost. Data-Centric Business and Applications. Lecture Notes on Data Engineering and Communications Technologies. 2024. Vol. 195. P. 277–295. DOI: https://doi.org/10.1007/978-3-031-54012-7_12
Bielienkova O., Novak Y., Matsapura O., Zapiechna Y., Kalashnikov D., Dubinin D. Improving the Organization and Financing of Construction Project by Means of Digitalization. International Journal of Emerging Technology and Advanced Engineering. 2022. Vol. 12, Issue 8. P. 108–115. DOI: https://doi.org/10.46338/ijetae0822_14
Tytok V., Emelianova O., Galinsky O., Lysytsia N., Malykhin M. Organisational and Economic Tools for Managing Investment Programmes Involving Construction Enterprises Through Digitalisation. Review of Economics and Finance. 2022. Vol. 20. P. 1060–1066. DOI: https://doi.org/10.55365/1923.x2022.20.118
Levchenko N. M., Beiner P. S., Beiner N. V. Reconstruction of Buildings Using BIM Technologies During City Renewal in Ukraine. Metal Science and Heat Treatment of Metals. 2022. No. 4(99). P. 64–70. DOI: https://doi.org/10.30838/J.PMHTM.2413.271222.64.912
McKinsey Global Institute. Reinventing Construction: A Route to Higher Productivity. McKinsey & Company, 2017. 168 p.
World Bank. Ukraine: Fifth Rapid Damage and Needs Assessment (RDNA5): February 2022–December 2025. Washington, DC: World Bank Group, 2026.
Saaty T. L. Decision Making with the Analytic Hierarchy Process. International Journal of Services Sciences. 2008. Vol. 1, No. 1. P. 83–98. DOI: https://doi.org/10.1504/IJSSCI.2008.017590
Rousseeuw P. J. Silhouettes: A Graphical Aid to the Interpretation and Validation of Cluster Analysis. Journal of Computational and Applied Mathematics. 1987. Vol. 20. P. 53–65. DOI: https://doi.org/10.1016/0377-0427(87)90125-7
MacKinnon J. G., White H. Some Heteroskedasticity-Consistent Covariance Matrix Estimators with Improved Finite Sample Properties. Journal of Econometrics. 1985. Vol. 29, No. 3. P. 305–325. DOI: https://doi.org/10.1016/0304-4076(85)90158-7
Zahoretska, O. Ya., & Dats, A. (2026). Orhanizatsiino-ekonomichnyi mekhanizm tsyfrovoi transformatsii budivelnykh pidpryiemstv na osnovi intehratsii BIM-tekhnolohii ta osvitnoho potentsialu [Organizational and economic mechanism of digital transformation of construction enterprises based on BIM integration and educational potential]. Uspikhy i dosiahnennia u nautsi, no. 2(24), pp. 1528–1537. DOI: https://doi.org/10.52058/3041-1254-2026-2(24)-1528-1537
Zahoretska, O. Ya., & Dats, A. (2026). Formuvannia konkurentospromozhnoi modeli diialnosti budivelnoho pidpryiemstva u vidnovlenni kultovykh sporud shliakhom vprovadzhennia BIM, kontroliu zmin ta KPI yak investytsiinoho instrumentariiu [Formation of a competitive construction enterprise model for restoration projects through BIM, change control and KPI]. Naukovi perspektyvy, no.2(68), pp. 2316–2328. DOI: https://doi.org/10.52058/2708-7530-2026-2(68)-2316-2328
Sorokina, L., Tsyfra, T., & Vahovich, I. (2024). Modeling the level of implementation of BIM by enterprises as a means of optimizing the cost. In Data-Centric Business and Applications (Lecture Notes on Data Engineering and Communications Technologies, Vol. 195, pp. 277–295). Springer. DOI: https://doi.org/10.1007/978-3-031-54012-7_12
Bielienkova, O., Novak, Y., Matsapura, O., Zapiechna, Y., Kalashnikov, D., & Dubinin, D. (2022). Improving the organization and financing of construction project by means of digitalization. International Journal of Emerging Technology and Advanced Engineering, no. 12(8), pp. 108–115. DOI: https://doi.org/10.46338/ijetae0822_14
Tytok, V., Emelianova, O., Galinsky, O., Lysytsia, N., & Malykhin, M. (2022). Organisational and economic tools for managing investment programmes involving construction enterprises through digitalisation. Review of Economics and Finance, no.20, pp. 1060–1066. DOI: https://doi.org/10.55365/1923.x2022.20.118
Levchenko, N. M., Beiner, P. S., & Beiner, N. V. (2022). Reconstruction of buildings using BIM technologies during city renewal in Ukraine. Metal Science and Heat Treatment of Metals, no. 4(99), pp. 64–70. DOI: https://doi.org/10.30838/J.PMHTM.2413.271222.64.912
McKinsey Global Institute. (2017). Reinventing construction: A route to higher productivity. McKinsey & Company. Available at: https://www.mckinsey.com/capabilities/operations/our-insights/reinventing-construction-through-a-productivity-revolution
World Bank. (2026). Ukraine: Fifth rapid damage and needs assessment (RDNA5): February2022-December2025. World Bank Group. Available at: https://documents1.worldbank.org/curated/en/099022026094036395/pdf/P514499-22f93f3a-4278-42bc-b907-db9553d12069.pdf
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, no. 1(1), pp. 83–98. DOI: https://doi.org/10.1504/IJSSCI.2008.017590
Rousseeuw, P. J. (1987). Silhouettes: A graphical aid to the interpretation and validation of cluster analysis. Journal of Computational and Applied Mathematics, no. 20, pp. 53–65. DOI: https://doi.org/10.1016/0377-0427(87)90125-7
MacKinnon, J. G., & White, H. (1985). Some heteroskedasticity-consistent covariance matrix estimators with improved finite sample properties. Journal of Econometrics, no. 29(3), pp. 305–325. DOI: https://doi.org/10.1016/0304-4076(85)90158-7
Published
Issue
Section
License
Copyright (c) 2026 А.Я. Дац

This work is licensed under a Creative Commons Attribution 4.0 International License.